Stellungszentrale/Auswertung.

 
         
         
 

Home

 
         
 

Back

 
         
  Part 1, T-Hütte.  
         
  Part 2, FA and St. Bunkers.  
         
 

Part 3, FA and St. Bunkers in France.

 
         
 

 
         
     The Stellungszentrale/Auswertung was initially known by it's popular name T-Baracke or T-Hut by the RAF Air Intelligence Service.  In it's initial form the main function was to serve as an ops-room from where the intercept control was performed.  Additionally the Stellung would report any tracks detected to the GefStd of the NJRF  
         
         
 

 
  A sketch of a T-Hut (windows are not indicated) in it's original shape .  The door and passway on the right leads to and connects with the mess! :-).  The legs of the Seeburg-Tisch were approximately 2,5 m. The surrounding control platform was elevated an estimated 1,5 m above the floor, the glass plate of the Seeburg-Tisch was approx.80 cm above the platform.  Measurements are based on original German drawings, the lay-out is based on POW interrogation reports.  
         
         
 

 

 
 

The T-Hut in RINGELNATTER, Houvig.

 

The foundation for the T-Hut in RINGELNATTER, Houvig.  The foundation for the Seeburg-Tisch can be seen clearly.  1999.

 
         
         
 

 

 
  The T-Hut in the never completed Stellung 73, Møn.   The T-Hut in TEEROSE II, with the kind permission of Mr. Willem H. Tiemens.  
         
         
     
  The T-Hut and Mess in KROKODIL, with the kind permission of Mr. Dines Bogø.   The remains of the Splitter Mauer around the T-Hut and the Mess in ROBBE SÜD,  1992.  
         
         
     In the above illustrations please note the variations in doors, windows and exits.  The T-Hut was not so "Regelbau".  
         
         
     When the Ln-Dienst was reorganized and the procedures for the production of the Luftlage was changed, the layout of the T-Huts in Stellungen 1'ord. was changed as well.  A Stellung 1'ord. would now serve as a local Flugmeldezentral receiving plots from Stellungen 2'ord. and a FLUKO.  This required an enlargement of the building in order to provide for a filtercenter.  
         
         
 

 
 

A sketch of a T-Hut (windows are not indicated) in a Stellung 1'ord. after the reorganization.  The right part of the building served as the filter center.  Measure-ments are based on original German drawings, the lay-out is based on POW interrogation reports and photos in author collection.

 
         
 

 
 

Drawing of the above based on POW interrogation.

 
         
    With the introduction of Y-Verfahren there was again a requirement for modifications in order to provide space for 5 Seeburg-Tische.  
         
         
   
 

A sketch of a T-Hut (windows are not indicated) in a Y-Stellung.  The 5 Seeburg-Tische were not elevated and there was no Seeburg Keller. The operators sat around the table along with the teller who reported the plot to the JD/Jafü GefStd.  Drawing based on German drawing.

 
         
 

 
  The T-Hut in Jagdleit Stellung GINSTER, Glæsborg.  
         
  Part 2, FA and St. Bunkers.  
         
         
         
   
   

 

   
 

Back