Stellungszentrale/Auswertung. |
||||
Part 1, T-Hütte. | ||||
Part 2, FA and St. Bunkers. | ||||
|
||||
The Stellungszentrale/Auswertung was initially known by it's popular name T-Baracke or T-Hut by the RAF Air Intelligence Service. In it's initial form the main function was to serve as an ops-room from where the intercept control was performed. Additionally the Stellung would report any tracks detected to the GefStd of the NJRF. | ||||
|
||||
A sketch of a T-Hut (windows are not indicated) in it's original shape . The door and passway on the right leads to and connects with the mess! :-). The legs of the Seeburg-Tisch were approximately 2,5 m. The surrounding control platform was elevated an estimated 1,5 m above the floor, the glass plate of the Seeburg-Tisch was approx.80 cm above the platform. Measurements are based on original German drawings, the lay-out is based on POW interrogation reports. | ||||
|
|
|||
The T-Hut in RINGELNATTER, Houvig. |
The foundation for the T-Hut in RINGELNATTER, Houvig. The foundation for the Seeburg-Tisch can be seen clearly. 1999. |
|||
|
|
|||
The T-Hut in the never completed Stellung 73, Møn. | The T-Hut in TEEROSE II, with the kind permission of Mr. Willem H. Tiemens. | |||
The T-Hut and Mess in KROKODIL, with the kind permission of Mr. Dines Bogø. | The remains of the Splitter Mauer around the T-Hut and the Mess in ROBBE SÜD, 1992. | |||
In the above illustrations please note the variations in doors, windows and exits. The T-Hut was not so "Regelbau". | ||||
When the Ln-Dienst was reorganized and the procedures for the production of the Luftlage was changed, the layout of the T-Huts in Stellungen 1'ord. was changed as well. A Stellung 1'ord. would now serve as a local Flugmeldezentral receiving plots from Stellungen 2'ord. and a FLUKO. This required an enlargement of the building in order to provide for a filtercenter. | ||||
|
||||
A sketch of a T-Hut (windows are not indicated) in a Stellung 1'ord. after the reorganization. The right part of the building served as the filter center. Measure-ments are based on original German drawings, the lay-out is based on POW interrogation reports and photos in author collection. |
||||
|
||||
Drawing of the above based on POW interrogation. |
||||
With the introduction of Y-Verfahren there was again a requirement for modifications in order to provide space for 5 Seeburg-Tische. | ||||
A sketch of a T-Hut (windows are not indicated) in a Y-Stellung. The 5 Seeburg-Tische were not elevated and there was no Seeburg Keller. The operators sat around the table along with the teller who reported the plot to the JD/Jafü GefStd. Drawing based on German drawing. |
||||
|
||||
The T-Hut in Jagdleit Stellung GINSTER, Glæsborg. | ||||
Part 2, FA and St. Bunkers. | ||||
|
||||